{"id":1828,"date":"2026-10-22T19:18:38","date_gmt":"2026-10-22T19:18:38","guid":{"rendered":"https:\/\/f3constructionny.com\/blog\/?p=1828"},"modified":"2026-10-25T02:58:49","modified_gmt":"2026-10-25T02:58:49","slug":"wood-deck-construction-in-st-james-ny","status":"publish","type":"post","link":"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/","title":{"rendered":"9 Things Every Homeowner Should Know Before Starting Wood Deck Construction"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A deck permit in the Town of Smithtown costs far less than the fine for building without one, yet it&#8217;s the step most homeowners skip. If you&#8217;re planning <strong>wood deck construction in St. James, NY<\/strong>, knowing the local rules, the right materials, and how to choose a qualified contractor can be the difference between a deck that adds real value to fyour home and one that becomes a legal headache.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">St. James sits within the Town of Smithtown, and the building department there takes deck construction seriously. This guide walks you through everything you need to know, from permits and wood species to hiring a contractor you can actually trust.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#1_Know_the_Smithtown_Permit_Rules_First\" >1. Know the Smithtown Permit Rules First<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#2_Choose_the_Right_Wood_Species_for_Long_Islands_Climate\" >2. Choose the Right Wood Species for Long Island&#8217;s Climate<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#3_Know_the_Difference_Between_Wood_and_Composite_Decking\" >3. Know the Difference Between Wood and Composite Decking<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#4_Time_Your_Project_for_the_Best_Results\" >4. Time Your Project for the Best Results<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#5_Comprehend_the_Full_Scope_of_a_Deck_Build\" >5. Comprehend the Full Scope of a Deck Build<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#6_Dont_Skip_Deck_Staining_and_Sealing\" >6. Don&#8217;t Skip Deck Staining and Sealing<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#7_Hire_a_Contractor_Who_Knows_Smithtowns_Code\" >7. Hire a Contractor Who Knows Smithtown&#8217;s Code<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#8_Think_About_the_Full_Outdoor_Picture\" >8. Think About the Full Outdoor Picture<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#9_Get_a_Quote_from_a_Contractor_You_Can_Trust\" >9. Get a Quote from a Contractor You Can Trust<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#FAQs\" >FAQs<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#Do_I_need_a_permit_for_a_wood_deck_in_St_James_NY\" >Do I need a permit for a wood deck in St. James, NY?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#What_is_the_best_wood_for_a_deck_on_Long_Island\" >What is the best wood for a deck on Long Island?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#How_long_does_it_take_to_build_a_wood_deck_in_St_James\" >How long does it take to build a wood deck in St. James?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/f3constructionny.com\/blog\/wood-deck-construction-in-st-james-ny\/#How_do_I_find_a_reliable_deck_contractor_in_St_James_NY\" >How do I find a reliable deck contractor in St. James, NY?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Know_the_Smithtown_Permit_Rules_First\"><\/span>1. Know the Smithtown Permit Rules First<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before a single board goes down, you need a permit. In the Town of Smithtown, any deck more than 8 inches above natural or approved grade requires a building permit. That covers the vast majority of backyard decks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The good news is that Smithtown now offers an online residential permitting system that includes a dedicated &#8220;Decks &amp; Porches&#8221; category. You can submit your application digitally rather than driving to the building department. Applications must be submitted in duplicate and either typewritten or clearly printed, and the golden rule is clear: <strong>a permit must be obtained before beginning work<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Beyond the structural permit, there&#8217;s also a &#8220;Deck Code\/Deck Zoning Location&#8221; document that governs where your deck can sit on your lot, setbacks from property lines, yard placement, and related restrictions. Once your deck is built, a town inspection is required before it&#8217;s considered complete. If you&#8217;re unsure whether your project needs a permit, call the Smithtown Building Department directly at 631-360-7522. For a deeper breakdown of permit requirements, check out our guide on <a href=\"https:\/\/f3constructionny.com\/blog\/does-building-a-deck-require-a-permit\/\" target=\"_blank\" rel=\"noreferrer noopener\">whether building a deck requires a permit<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Choose_the_Right_Wood_Species_for_Long_Islands_Climate\"><\/span>2. Choose the Right Wood Species for Long Island&#8217;s Climate<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/f3constructionny.com\/blog\/wp-content\/uploads\/2026\/10\/wordrocket-image-1792423889.webp\" alt=\"2. Choose the Right Wood Species for Long Island's Climate\"\/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Not all wood performs equally on Long Island. The region&#8217;s humid summers, wet springs, and cold winters put real stress on outdoor lumber. Here are the most common options:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pressure-Treated Pine<\/strong> is the most budget-friendly and widely used structural wood. It resists rot and insects well, but it needs regular sealing and can warp if not properly acclimated before installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cedar<\/strong> is naturally resistant to moisture and insects, lighter in weight, and has a warm aesthetic. It&#8217;s a popular choice for deck boards and railings in St. James neighborhoods.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Redwood<\/strong> offers excellent durability and a rich color, though it&#8217;s harder to source on Long Island and typically costs more.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Ipe (Brazilian Hardwood)<\/strong> is extremely dense and durable, it can last decades with minimal maintenance, but it requires specialized tools and fasteners during installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Comprehending how Long Island&#8217;s seasonal weather affects each material is critical to a long-lasting build. Our article on <a href=\"https:\/\/f3constructionny.com\/blog\/how-climate-affects-deck-construction-and-material-selection\/\" target=\"_blank\" rel=\"noreferrer noopener\">how climate affects deck construction and material selection<\/a> goes deeper on this topic.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Know_the_Difference_Between_Wood_and_Composite_Decking\"><\/span>3. Know the Difference Between Wood and Composite Decking<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Many homeowners start researching wood deck construction and end up wondering whether composite is a better fit. It&#8217;s a fair question. Composite decking, made from a blend of wood fiber and plastic, requires less maintenance and resists fading, staining, and mold. Nonetheleess, it typically costs more upfront than pressure-treated lumber.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Wood decks, on the other hand, offer a natural look and feel that many homeowners in St. James prefer. They can be stained, painted, or left to weather naturally. The trade-off is maintenance: wood needs to be cleaned, stained, and sealed on a regular schedule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you want to explore the composite side of the equation before making a final call, our <a href=\"https:\/\/f3constructionny.com\/blog\/what-is-the-life-expectancy-of-a-composite-deck-myths-and-truths\/\" target=\"_blank\" rel=\"noreferrer noopener\">composite deck lifespan guide<\/a> breaks down the myths and realities. And if you&#8217;re leaning toward composite but want certified installation, F3 Construction Corp is a <strong>Trex RainEscape Certified<\/strong> installer, a real differentiator when it comes to quality drainage and waterproofing beneath the deck surface.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_Time_Your_Project_for_the_Best_Results\"><\/span>4. Time Your Project for the Best Results<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Timing matters more than most homeowners realize. Late spring and early fall are generally the best seasons for wood deck construction on Long Island. The wood is less likely to warp from extreme heat, and contractors have more scheduling flexibility than during the peak summer rush.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Winter construction is possible but comes with challenges, cold temperatures affect stain adhesion and concrete curing for footings. If you&#8217;re planning ahead, booking your contractor in late winter for a spring build is a smart move. Our guide on <a href=\"https:\/\/f3constructionny.com\/blog\/the-best-time-of-year-to-build-a-deck\/\" target=\"_blank\" rel=\"noreferrer noopener\">the best time of year to build a deck<\/a> covers this in detail, including how each season affects material performance and labor availability.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_Comprehend_the_Full_Scope_of_a_Deck_Build\"><\/span>5. Comprehend the Full Scope of a Deck Build<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A wood deck isn&#8217;t just boards and railings. A proper build involves multiple systems working together:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Footings and posts:<\/strong> Concrete footings below the frost line (required in New York) anchor the entire structure.<\/li>\n\n\n\n<li><strong>Beam and joist framing:<\/strong> This is the skeleton. Proper spacing and lumber grade are critical for load-bearing safety.<\/li>\n\n\n\n<li><strong>Ledger board connection:<\/strong> Where the deck meets the house, flashing and proper fasteners prevent water intrusion, one of the most common failure points.<\/li>\n\n\n\n<li><strong>Decking boards:<\/strong> Spacing matters here too. Proper gaps allow water to drain and the wood to expand seasonally.<\/li>\n\n\n\n<li><strong>Railings and balusters:<\/strong> Required by code for decks above a certain height, and a major design element.<\/li>\n\n\n\n<li><strong>Stairs:<\/strong> Code-compliant rise and run dimensions are non-negotiable.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For a comprehensive overview of what goes into a full outdoor living project in our region, the <a href=\"https:\/\/f3constructionny.com\/blog\/deck-outdoor-living-space-master-guide\/\" target=\"_blank\" rel=\"noreferrer noopener\">Deck &amp; Outdoor Living Space Master Guide for Long Island, NY<\/a> is a great resource.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"6_Dont_Skip_Deck_Staining_and_Sealing\"><\/span>6. Don&#8217;t Skip Deck Staining and Sealing<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">One of the most common mistakes after a wood deck is built is neglecting the finish. Unfinished wood on Long Island will gray, crack, and absorb moisture within a single season. A quality stain and sealer protects the wood from UV damage, moisture, and mildew.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Timing matters here too. Staining too soon after installation, before the wood has dried out, can cause the stain to peel. Staining too late leaves the wood unprotected. Our guide on <a href=\"https:\/\/f3constructionny.com\/blog\/guide-to-know-how-long-for-deck-stain\/\" target=\"_blank\" rel=\"noreferrer noopener\">how long deck stain takes to dry by stain type<\/a> is a practical reference for getting this step right.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"7_Hire_a_Contractor_Who_Knows_Smithtowns_Code\"><\/span>7. Hire a Contractor Who Knows Smithtown&#8217;s Code<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/f3constructionny.com\/blog\/wp-content\/uploads\/2026\/10\/wordrocket-image-1792423891.webp\" alt=\"7. Hire a Contractor Who Knows Smithtown's Code\"\/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The St. James and broader Smithtown area has an active community of deck contractors, ranging from solo carpenters to full general contractors. When evaluating anyone for your project, ask these questions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Are you licensed and insured in New York State?<\/li>\n\n\n\n<li>Do you handle the permit process, or is that left to the homeowner?<\/li>\n\n\n\n<li>Can you provide references from completed deck projects in Smithtown or nearby towns?<\/li>\n\n\n\n<li>Are you familiar with the Town&#8217;s setback and zoning requirements?<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A contractor who pulls permits, schedules inspections, and knows the local code is worth more than one who offers a lower price but leaves you holding the liability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">F3 Construction Corp has over 20 years of experience serving Long Island homeowners, is fully licensed and insured, and is a BBB Accredited Business. Owner Olman Flores is personally involved in project consultations, and General Manager Ivis is recognized by clients for clear, reliable communication throughout every project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"8_Think_About_the_Full_Outdoor_Picture\"><\/span>8. Think About the Full Outdoor Picture<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A wood deck rarely stands alone. Many homeowners in St. James are also adding pergolas, porticos, masonry patios, or outdoor lighting as part of a broader backyard renovation. Thinking about the full picture before construction begins can save you from having to tear up finished work later.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">F3 Construction Corp offers a full range of exterior services, including portico construction, patio work, and masonry, so you can coordinate everything under one contractor. See real project photos in our <a href=\"https:\/\/f3constructionny.com\/gallery.php\" target=\"_blank\" rel=\"noreferrer noopener\">project gallery<\/a> to get a sense of what&#8217;s possible.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"9_Get_a_Quote_from_a_Contractor_You_Can_Trust\"><\/span>9. Get a Quote from a Contractor You Can Trust<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pricing for wood deck construction in St. James, NY varies based on size, wood species, design complexity, permit fees, and site conditions. No honest contractor can give you an accurate number without seeing your property.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What you should look for is transparency: a contractor who walks your yard, asks the right questions, and provides a written estimate that accounts for materials, labor, permits, and inspections. Vague quotes lead to surprise costs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To explore more about what goes into deck project planning and costs on Long Island, our <a href=\"https:\/\/f3constructionny.com\/blog\/deck-or-patio-cost-guide\/\" target=\"_blank\" rel=\"noreferrer noopener\">deck or patio cost guide<\/a> is a helpful starting point.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ready to move forward? Contact F3 Construction Corp at <strong>(631) 278-8693<\/strong> or visit <a href=\"https:\/\/f3constructionny.com\/contact.php\" target=\"_blank\" rel=\"noreferrer noopener\">f3constructionny.com\/contact.php<\/a> for a free quote. We serve St. James, Central Islip, Smithtown, and surrounding Long Island communities.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs\"><\/span>FAQs<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Do_I_need_a_permit_for_a_wood_deck_in_St_James_NY\"><\/span><strong>Do I need a permit for a wood deck in St. James, NY?<\/strong> <span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. In the Town of Smithtown, which includes St. James, any deck more than 8 inches above natural or approved grade requires a building permit. You must obtain the permit before beginning construction. The Town offers an online permitting system for residential projects, including decks and porches. If you&#8217;re unsure, contact the Smithtown Building Department at 631-360-7522.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_best_wood_for_a_deck_on_Long_Island\"><\/span><strong>What is the best wood for a deck on Long Island?<\/strong> <span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pressure-treated pine is the most common and affordable choice for structural framing. For deck boards, cedar is popular for its natural resistance to moisture and insects. Ipe hardwood offers exceptional durability if budget allows. The right choice depends on your maintenance preferences, aesthetic goals, and budget, a qualified contractor can help you weigh the options for Long Island&#8217;s specific climate.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_long_does_it_take_to_build_a_wood_deck_in_St_James\"><\/span><strong>How long does it take to build a wood deck in St. James?<\/strong> <span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A standard wood deck typically takes one to three weeks to build, depending on size and complexity. Nevertheless, the full timeline includes permit approval, which can add several weeks depending on the town&#8217;s current workload. Planning ahead, especially booking in late winter for a spring build, helps avoid delays.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_do_I_find_a_reliable_deck_contractor_in_St_James_NY\"><\/span><strong>How do I find a reliable deck contractor in St. James, NY?<\/strong> <span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Look for a contractor who is licensed and insured in New York State, familiar with Smithtown&#8217;s permit and zoning requirements, and willing to handle the permit process on your behalf. Ask for references from local projects and verify their BBB standing. F3 Construction Corp checks all of these boxes and has served Long Island homeowners for over 20 years. Call <strong>(631) 278-8693<\/strong> or request a free quote at <a href=\"https:\/\/f3constructionny.com\/contact.php\" target=\"_blank\" rel=\"noreferrer noopener\">f3constructionny.com\/contact.php<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A deck permit in the Town of Smithtown costs far less than the fine for building without one, yet it&#8217;s the step\u2026<\/p>\n","protected":false},"author":1,"featured_media":1832,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_reading_time":0,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-1828","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-deck-construction-insights"],"_links":{"self":[{"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/posts\/1828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/comments?post=1828"}],"version-history":[{"count":2,"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/posts\/1828\/revisions"}],"predecessor-version":[{"id":1836,"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/posts\/1828\/revisions\/1836"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/media\/1832"}],"wp:attachment":[{"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/media?parent=1828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/categories?post=1828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/f3constructionny.com\/blog\/wp-json\/wp\/v2\/tags?post=1828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}